ACI 304R PDF

Kigor Test placements should be examined for concrete surface flatness, amount of laitance present, quality of concrete at the extreme flow distance of the test, and flow around t items, if appropriate. Tremies started using a go-devil should be lifted a maximum of 6 in. The first six chapters are general and apply to all types of projects and concrete. Because the success of an underwater placement depends largely on the concrete itself, sampling and testing during the placement are critical to ensure compliance with approved mixtures and required concrete characteristics slump, air content, temperature. Manual plants are acceptable for small jobs having low batching-rate requirements. Steel fibers are packaged in various sizes; the most common are 50 or lb 23 or 45 kg increments.

Author:Bagor Zolomi
Country:Poland
Language:English (Spanish)
Genre:Photos
Published (Last):13 March 2017
Pages:408
PDF File Size:17.24 Mb
ePub File Size:18.79 Mb
ISBN:571-6-48830-533-9
Downloads:84269
Price:Free* [*Free Regsitration Required]
Uploader:Kiganris



Kigor Test placements should be examined for concrete surface flatness, amount of laitance present, quality of concrete at the extreme flow distance of the test, and flow around t items, if appropriate. Tremies started using a go-devil should be lifted a maximum of 6 in. The first six chapters are general and apply to all types of projects and concrete.

Because the success of an underwater placement depends largely on the concrete itself, sampling and testing during the placement are critical to ensure compliance with approved mixtures and required concrete characteristics slump, air content, temperature. Manual plants are acceptable for small jobs having low batching-rate requirements. Steel fibers are packaged in various sizes; the most common are 50 or lb 23 or 45 kg increments.

R Guide for Measuring, Mixing, Transporting, and Placing Concrete Reapproved Mixing is accomplished by paddles attached to one or two rotating horizontal shafts. Sounding wells are usually left in place and become a r part of the structure. Interlocks, however, interrupt the batching cycle when the scale does not return to 0. Grooved-end connections should not be used on pipeline with diameter greater than 3 in.

Fluid pressure on forms should be correlated to the capacity and type of placement equipment, planned rate of placing concrete, slump, temperature, and stiffening characteristics of the concrete.

Under normal circumstances, it is necessary only to remove laitance and expose the sand and sound surface mortar by sandblasting or high-pressure water jetting. In general, the preparation of a vertical construction joint for acceptable performance and appearance is the same as for horizontal joints.

Progress in improvement of concrete construction is better served by the presentation of high standards rather than common practices; In many, if not most, cases, practices resulting in the production and placement of high-quality concrete can be performed as economically as those resulting in poor concrete.

Concrete placement should not commence when there is a chance of freezing temperatures occurring, unless adequate facilities for cold-weather protection have been provided ACI R. The stream of concrete should not be separated by falling freely over rods, spacers, reinforcement, or other embedded materials. In deep placements, buoyancy of the pipe can be a problem if an end plate is used to gain the initial tremie seal.

A concrete of correct proportions, consistency, and texture placed and finished monolithically with the base concrete, however, is preferable to a mortar topping. Rescreening the coarse aggregate as it is charged to the bins at the batch plant to remove undersized materials will effectively eliminate undesirable fines when usual storage and handling methods are not satisfactory.

The committee is aware of instances in which concrete has been dropped several thousand feet in this manner without adverse effects. This type of concrete is particularly useful where concrete is to be placed under water, where structures are heavily reinforced for seismic or other reasons, where structural concrete or masonry is to be repaired, or where concrete of low volume change is required U.

Bureau of Reclamation Applications of these antiwashout admixtures include underwater paving of a canal Kepler ; Klemens and underwater repair of a dam Neeley and Wickersham Depending on the volume of the placement and the anticipated thermal conditions within the placement, maximum temperatures in the range of 60 to 90 F 16 to 32 C are normally specified.

An experienced individual should be available to interpret soundings and make necessary decisions concerning relocation of placement pipes and air lifts, and to observe overall placement procedures. ACI R The rate of wear can vary greatly. Horizontal construction joints will occur at the levels between lifts, whereas vertical joints occur where the structure is of such length that it is not feasible to place the entire length in one continuous operation.

Inner mixer surfaces should be kept clean and worn blades should be replaced. Visual observation of each material being batched is helpful in achieving this objective. A method of documenting the inspection should be developed and approved by all parties before the start of work. The surfaces of all construction joints should be cleaned and properly prepared to ensure adequate bond with concrete placed on or adjacent to them and to obtain required watertightness U.

Materials tend to segregate during transportation, so reblending may be necessary. A final detailed inspection of the foundation, xci joints, forms, water stops, reinforcement, and any other embedments in the placement should be made immediately before the concrete is placed.

Calculation of a projected rate is somewhat difficult because the exact flow pattern of the concrete will not be known.

They should have rounded corners, be constructed of steel or be steel-lined, and should have sufficient capacity to avoid overflow. This condition can be alleviated by the placement of a layer of properly graded rock before the start of concreting. Maintaining a running average of the results of the five to 10 previous gradation tests, dropping the results of the oldest and adding the most recent to the total on which the average is calculated, is good practice.

Careful, consistent concrete control with suitable mixture adjustments for changing ambient temperatures is required. For example, an air-entraining admixture can be beneficial because of the increased workability that can be achieved with its use. Amazon Advertising Find, attract, and engage customers. As long as a running vibrator will sink into the concrete by means of its own weight, it is not too late for the concrete to benefit from revibration, which improves compressive and bond strengths.

Effective control of segregation and undersized materials is most easily accomplished when the ratio of maximum-to-minimum size in each fraction is held to not more than four for aggregates smaller than 1 in. Locations for taking soundings should be marked on the structure to ensure that all soundings are made at the same location. In underwater construction, higher placing rates at lower cost have been achieved by this method than by conventional placement methods.

Given the small amount of the admixture used for this application, use of an activating admixture is not usually required. Hand tools such as wire brushes, wire brooms, hand picks, or bush hammers can be used to acu dirt, laitance, and soft mortar, but are only practical for small areas.

Evaporation of the liquid could adversely affect the performance of the admixture ACI For a more detailed discussion, refer to ACI Planning for an underwater placement should begin as soon as the decision to do the project has been made. Water should never be added to concrete in the truck body because no mixing is performed by the agitator. TOP 10 Related.

HEJVUD POLITIKA PDF

ACI-304R-00: Guide for Measuring, Mixing, Transporting, and Placing Concrete (Reapproved 2009)

Gukazahn When the horizontal surface procedure is not practical, as when plan dimensions are relatively large compared to the depth, the advancing slope method is used. After that, a tremie should not be lifted again until a sufficient mound is established around the mouth acu the tremie. Visual observation of each material being batched is helpful in achieving this objective. Specially designed fabric assemblies have been used to cast saddles and weights for underwater pipelines. Use only as much water and fine aggregate as is required to achieve suitable workability for proper placement and consolidation acci means of vibration.

BARTENIEFF FUNDAMENTALS PDF

ACI 318: Building Code Requirements for Reinforced Concrete

Gogal Work normally progresses from one end of a large placement to the other. These admixtures are also used to hold concrete during the day for reuse on the same day. The gradation of aggregate as it enters the concrete afi should be uniform and within specification limits. A discharge gate and vibrators mounted on the body should be provided at the 30r4 of discharge for control of flow. They should have rounded corners, be constructed of steel or be steel-lined, and should have sufficient capacity to avoid overflow.